For new court construction, the process starts with a site assessment covering slope, drainage, and base material selection, asphalt or concrete, before any scope is written. Multi-use striping layouts can place basketball, tennis, and pickleball lines on a single court footprint, which matters for school districts and recreation departments working within a fixed space.
Resurfacing projects follow a different sequence. A surface walk-through identifies crack patterns, low spots, and drainage failures. Where slope or base issues are found, correction happens at the sub-base level before acrylic coating is applied. Skipping that step means the new surface fails along the same fault lines as the old one.
Orange County’s warm, dry climate accelerates acrylic fade and surface oxidation, so inspection cycles matter for HOA and school courts that see daily use. The written scope separates base work, coating, striping, fencing, and drainage as individual line items, giving property managers and board members a clear picture of what each element costs and why it is included.